MAYLAN was awarded the Bentley contract for the construction of a 200,000 sq. ft. warehouse and store. The facility was constructed as a conventional steel structure with a flat roof, which included space for a store area at the front of the building, loading docks for merchandise delivery as well as a mezzanine level for office space. During the planning phase of the project, particular attention was given to environmental issues concerning water and a holding pond was built into the solution.